RC Parkwest
RC Parkwest Phase 1 is a residential development in Syracuse, UT consisting of 40 single-family building lots and 9 multi-family townhome sites. Thurgood Excavating installed 18,500 linear feet of storm drain, land drain, sewer, culinary, and secondary pipe ranging from 8"-24". In addition to underground utilities, our contract included prepping and grading the site for asphalt.
RC Parkwest
RC Parkwest
RC Parkwest
RC Parkwest
RC Parkwest
RC Parkwest
RC Parkwest
RC Parkwest
RC Parkwest
RC Parkwest
RC Parkwest
RC Parkwest
RC Parkwest
RC Parkwest